HAI DUONG GARDEN

Khách hàng
TM VIETNAM DEVELOPMENT CO., LTD.
Sector
Hotel / Serviced Apartment
Địa điểm
HAI PHONG

Supporting Renovation and Facility Improvement at Hai Duong Garden

Hai Duong Garden is a hotel and serviced apartment in Hai Phong City, with an eight-storey reinforced concrete structure and an approximate floor area of 6,000 m².

TM Vietnam Development carried out several improvement works at the property, including guest room renovation, wastewater treatment works and pump room repair.

Plus PM Vietnam supported the Client through Site Observation Support and Design Management Consultancy, covering construction monitoring, technical review, schedule follow-up, design coordination and cost review across the different work packages.

The guest room renovation included eight rooms on the third floor and was completed in May 2026.

hai-duong-garden-1

Project Information

ClientTM VIETNAM DEVELOPMENT CO., LTD.
Location54 Do Ngoc Du Street, Hai Phong City (formerly Hai Duong Province), Vietnam
SectorHotel / Serviced Apartment
GFAApproximately 6,000 m²
StructureReinforced Concrete (RC)
Floors 8 Floors
Guest Room Renovation8 rooms on the third floor
CompletionMay 2026
DesignMasuoka Gumi Co., Ltd.
ContractorFrontier Consulting Vietnam Co., Ltd.
Plus PM ServicesSite Observation Support / Design Management Consultancy

Our Services

01 Site Observation Support

Plus PM Vietnam provided Site Observation Support for the guest room renovation and pump room repair works.

The scope included reviewing shop drawings, method statements and material submissions, checking on-site construction methods and progress, verifying installed materials, reviewing contractor reports, monitoring schedule performance and reporting issues requiring corrective action.

02 Design Management Consultancy

For the wastewater treatment works, Plus PM Vietnam supported the Client through the design development process.

The scope included reviewing design documents and drawings, coordinating requirements across civil, wastewater treatment and MEP disciplines, identifying design conflicts or incomplete information, and supporting communication between the Client and project team.

03 Schedule and Progress Management

Plus PM Vietnam monitored design and construction progress against the agreed project schedules.

For construction works, the team reviewed contractor progress and followed up on delays or issues requiring action. For the wastewater treatment scope, monitoring also covered design, permitting and construction schedules.

04 Cost Review

As part of the wastewater treatment design management scope, Plus PM Vietnam reviewed construction cost estimates and contractor cost-reduction proposals.

This supported the Client in considering project cost alongside technical and design requirements during project development.

05 Client and Contractor Coordination

Plus PM Vietnam supported coordination between the Client, contractors and other project parties throughout the assignments.

The team attended regular meetings, followed up on technical and construction matters, and provided periodic and ad-hoc reports to keep the Client informed of project progress and issues requiring attention.