HAI DUONG GARDEN HOTEL

Client
TM VIETNAM DEVELOPMENT CO., LTD.
Sector
Hotel / Serviced Apartment
Location
Hai Phong

Supporting Renovation and Facility Improvement at Hai Duong Garden

Hai Duong Garden is a hotel and serviced apartment in Hai Phong City, with an eight-storey reinforced concrete structure and an approximate floor area of 6,000 m².

TM Vietnam Development carried out several improvement works at the property, including guest room renovation, wastewater treatment works and pump room repair.

Plus PM Vietnam supported the Client through Site Observation Support and Design Management Consultancy, covering construction monitoring, technical review, schedule follow-up, design coordination and cost review across the different work packages.

The guest room renovation included eight rooms on the third floor and was completed in May 2026.

hai-duong-garden-1

Project Information

ClientTM VIETNAM DEVELOPMENT CO., LTD.
Location54 Do Ngoc Du Street, Hai Phong City (formerly Hai Duong Province), Vietnam
SectorHotel / Serviced Apartment
GFAApproximately 6,000 m²
StructureReinforced Concrete (RC)
Floors8 Floors
Guest Room Renovation8 rooms on the third floor
DesignMasuoka Gumi Co., Ltd.
ContractorFrontier Consulting Vietnam Co., Ltd.
Plus PM ServicesSite Observation Support / Design Management Consultancy

Our Services

01 Site Observation Support

Plus PM Vietnam provided Site Observation Support for guest room renovation and pump room repair works.

The scope included reviewing shop drawings, method statements and material submissions, checking on-site construction methods and progress, verifying installed materials, and reporting issues requiring corrective action.

02 Design Management Consultancy

For the wastewater treatment works, Plus PM Vietnam supported Client through design development process.

The scope included reviewing design documents and drawings, coordinating civil, wastewater treatment and MEP requirements, and identifying design conflicts or incomplete information.

03 Schedule and Project Coordination

Plus PM Vietnam monitored design and construction progress against the agreed schedules and followed up on delays or issues requiring action.

The team also attended project meetings and coordinated with Client, contractors and other project parties to support smooth project execution.

04 Cost and Technical Review

As part of the wastewater treatment design management scope, Plus PM Vietnam reviewed construction cost estimates and contractor cost-reduction proposals.

This helped Client consider cost implications together with technical and design requirements during project development.